
Add to Cart
Temperature Rangeradius 400 Degree Plastic Testing Machine For ABS Melt Volume Flow Rate
Uses:
KJ-3092 melt flow rate testing instrument can be used for ABS, polystyrene, polyethylene, polypropylene, polyamide, fiber resin, acrylate, POM, fluorine plastic, polycarbonate and other plastic materials, the melt flow rate (MFR) or the melt volume flow rate (MVR) to be determined.
1. Product Description:
Design Standard | GB/T3682-2000,ISO1133-97, ASTM1238
|
Barrel parameters | Inner hole 9.55±0.025mm |
Pistons parameters | Piston head: 9.475±0.015mm |
Piston length | H=6.35±0.1mm |
Paramters | Extrusion hole 1=2.095±0.005mm |
Temperature parameter | With intelligent temperature control instrument, with four pairs of significant temperature setting control, PID parameters can be automatically set, precision up to ± 0.1 degree centigrade |
Temperature rangeradius | 400degree centigrade |
Temperature accuracyblade to jawand dust collector | ±0.2 degree centigrade |
Display resolution | 0.1degree centigrade |
Maximum comsuption | < 600W |
Temperature recovery time | less 4 min. |
Weight parameters are as follows: | |
Weight accuracy | ±0.5% |
Basic configuration | 0.325 kg,1. kg,2.1 kg,3. kg,5. kg,10.0 kg 12. kg,21.6 kg |
Position detection | |
Loop distance from up and down | 30mm |
Control precision | ± 0.1mm |
Test flow control | |
Times of cutting the material | 0~10 times |
Material cutting interval | 0~999s(set reference Table 2) |
Control flow reaches the set temperature without volatility | |
Barrel temperature time | 15 min. |
Material be installed | 1 min |
Material sample temperature recovery time | 4 min. |
When binder set | 1min |
2. Product Design Standard
ASTM D903, GB/T2790/2791/2792, CNS11888, JIS K6854, PSTC7, GB/T 453, ASTM E4, ASTM D1876, ASTM F2256, EN1719, EN 1939, ISO 11339, ISO 36, EN 1465, ISO 13007, ISO 4587, ASTM C663, ASTM D1335,
Our services
1). Warranty time: All machines are guaranteed for one year free that we provide spare components except the wrong operation or damaged by people on purpose.
2). Teaching services: Our engineers will teach your staff to operate the machine during the period of installation and commissioning, and they will not leave until your staff can operate it properly and normally when it necessary.
3). Certificate services: Complying with our clients' request, we can provide related certificates to clients freely
4). Maintenance services: If you have any questions or any malfunction happened,we will reply you within 48 hours .